20-30mm、10-20mm、5-10mm、0-5mm
It can crush more than 100 kinds of rocks. The common discharge size is...
The crushing method of the jaw crusher is a curved extrusion type, which is mainly composed of a frame, an eccentric shaft, a large pulley, a flywheel, a side guard, a toggle plate, a back seat of the toggle plate, a clearance adjustment screw, a return spring, a fixed jaw plate and a movable plate. Jaw plate and other parts. SC jaw crusher is usually driven by motor as the power source. When working, the motor drives the belt and pulley, and the movable jaw moves up and down through the rotation of the eccentric shaft. When the movable jaw rises, the angle between the toggle plate and the movable jaw becomes larger, thereby pushing the movable jaw to approach the fixed jaw, and at the same time, the material is crushed or Chop into pieces to achieve the purpose of breaking. When the movable jaw goes down, the angle between the toggle plate and the movable jaw becomes smaller, the movable jaw plate leaves the fixed jaw plate under the action of the pull rod and the spring, and the crushed material is discharged from the lower part of the crushing chamber. With the continuous rotation of the motor, the crusher performs periodic motion to crush the materials and discharge them to achieve mass production.
Model | Feed port size(mm) | Capacity(t/h) | Power(kw) | Stationary Plant use |
SC80 | 800X510 | 65-380 | 75 | |
SC100 | 1000X760 | 150-545 | 110 | |
SC110 | 1100X850 | 190-625 | 160 | |
SC125 | 1250X950 | 290-845 | 160 | |
SC140 | 1400X1070 | 385-945 | 200 | |
SC160 | 1600X1100 | 520-1275 | 250 | |
SC96 | 930X580 | 120-455 | 90 | Mobile Plant use |
SC106 | 1060X700 | 155-580 | 110 | |
SC116 | 1150X800 | 170-600 | 132 | |
SC120 | 1200X870 | 303-529 | 160 |
A: the product warranty period is 12 months since shipping date.
A: We have professional engineers abroad, after receiving your request, we will solve your problems at first time.
A: Our company can provide machine`s parts for your any time.
7-10 days for the stock, 15-30 days for the mass production.
30% deposit in T/T advance, 70% balance before shipment.
Yes, we can help you set up a complete production line and give you related professional advice. We had already build many mining projects in China & Overseas.
Copyright © 2025 Henan Xianglong Machinery Equipment Co., Ltd.